Tuesday, July 5, 2011

Structure examination and tools startup checklist kitchen area and dishwasher exhaust followers


Tools sort: Kithen hood exhaust admirer and dishwasher exhaust fan


Products designation: EF-1 and EF-2


Bar code designation: #######


REFERENCE

* 2004 ASHRAE Handbook--Systems & Gear.


* 2003 ASHRAE Handbook--Applications, Chapter 3 ("Dining establishments/Cafeterias").


Style Examination / TRICKS OF THE TRADE


* Verify there is safe and sound access to the gear.


* Confirm duct routing, construction, and insulation considering of the sorts of methods currently being inspected (kitchen area exhaust/grease and dishwasher exhaust/wet).


* Verify there will not be quick-circuiting of exhaust air into air intakes and/or other constructing openings.


* Spot-look at total fan static (and velocity stress) for extreme/insufficient strain drop.


* Attach devices routine and layout requirements to checklist.


* Attach sequence of operation to checklist.


* Attach associated agreement detail drawing to checklist.


Be aware


* Refer to tools manufacturers' literature for added info and necessities.


* Refer to the December 2002 "HVACR Designer Recommendations" column for a little more specific drawing, style, and value engineering steps for kitchen hood exhaust programs.




Author: Amanda McKew

No comments:

Post a Comment